About Job tab on Live Tracking Screen
We have a listing window on the left side of the screen, which displays the job details. Using this, all the jobs can be monitored in one place. A particular job can be tracked by clicking on it.
To view the job tab, go to Listing Panel > Job tab.
It consists of the following features and details:
Job status is displayed in a color coded form on the job status bar. This show the number of jobs in a particular status as shown i the below image:
From here a user can perform actions on the jobs.
Below given are the actions that can be performed:
The detailed job information can be viewed here in one place.
When the user selects a particular job, the screen that is displayed is as shown below:
Following is the type of information that can be viewed in the job information list:
Running Jobs that are ongoing or are being performed at the moment. |
|
Completed Jobs that are already completed successfully. |
|
Upcoming Jobs that are upcoming in future. |
|
Fail Jobs that weren’t completed successfully, hence, failed. |
When the user clicks on the object, the path taken by that particular object on that day is displayed on the screen.
When the user clicks on a specific job, a tab opens at the bottom of the screen and on the right side of the screen.
The tab at the bottom shows all the information of the job in a detailed form. Information like the estimated and actual time of the job start/completion, the number of checkpoints, the status of the checkpoints, addresses of the checkpoints, halts, distance, duration, alerts, etc. is displayed here.
The tab that opens on the right is the playback settings tab which is shown in the below given image:
A user can select what all data they want on the map to be displayed.